AI Readiness
The same facility. Different systems.
What the assessment determines — and what it changes.
Today
Your existing facility
Any size · any age
Built for the last decade
Power, cooling, structure — designed for a different compute era
CRAC
Heat disperses into room · full HVAC load
→
After assessment + retrofit
AI workload-ready
Same building · right-sized systems
Matched to your deployment
Cooling and power sized to your actual AI workload needs
CDU ← Supply (cool) Return (warm) →
Heat captured at chip · contained loop · controlled cost
The distance between left and right is not the same for every facility. The assessment tells you exactly where yours stands.