Forensic Engineering

Forensic engineering is a specialized field that demands experience, knowledge, and advanced technology. At Mission Critical Engineers, we offer cross-disciplinary forensic investigative services across essential engineering disciplines. With extensive experience and cutting-edge technology, our experts deliver top-tier forensic engineering services to clients, including insurance companies, legal firms, public utilities, manufacturers, facility owners, and industrial sectors. Our focus on data center and mission-critical engineering enables us to provide unique forensic investigation services to this sector.

Our Areas of Expertise:
  • Failure Analysis: Investigating the root causes of structural, electrical, and mechanical failures to prevent recurrence and enhance future designs.
  • Damage Assessment: Evaluating damage to critical infrastructure and providing detailed reports for restoration and claims processing.
  • System Performance Evaluation: Analyzing data center systems to identify inefficiencies and recommend improvements.
  • Risk Mitigation: Developing strategies to minimize risks and enhance the resilience of mission-critical facilities.
  • Compliance and Standards Review: Ensuring adherence to industry standards and regulatory requirements.
  • Incident Investigation: Conducting thorough investigations to determine the causes and accountability of incidents affecting data center operations.
  • Expert Testimony: Providing expert analysis and testimony in legal proceedings related to engineering failures.
Comprehensive Forensic Services:
  • Data Center Downtime Analysis:
    • Investigating causes of service loss and productivity issues.
    • Root Cause Analysis: Examining failures like power and cooling loss to critical IT loads.
    • Reliability and Availability Assessment
  • Battery Energy Storage System (BESS) Failures
  • Solar and Wind Farm Electrical System Failures
  • EV Charging Station Failures
  • Electrical Failures:
    • Low, medium, and high-voltage power supply and distribution equipment
    • Switchgear, transformers, underground cables, overhead powerlines
    • Power distribution equipment, panelboards, pull boxes, bus ducts, cables
    • Uninterrupted Power Units (UPS)
    • Motor Control Centers
    • Energy Storage Systems (battery systems and units)
    • Power generation and distribution control and monitoring systems
    • Electrically induced arcing and fire incidents
    • Fire and explosions involving electrical systems/equipment
    • Lightning strike incidents and damage
    • Compliance with Canadian/Ontario electrical codes and standards
    • Incidents caused by utility power surges and distribution faults
    • Electrical motor and generator failures (utility substations and plants)
    • Control and alarm system analysis (fire detection, security, fire suppression, environmental monitoring)
    • Product liability (equipment, appliances, electronics)
    • Injuries from electrical incidents (electrocution, electric shock)
    • Renewable energy systems (solar power, wind farm equipment)
    • Agricultural equipment and greenhouse control malfunctions
    • Neon and LED sign fires
    • Fires of HID and fluorescent light circuits/ballasts
    • Loss events caused by static electricity
  • Field Testing and Evaluation:
    • Transformer and Cable Conductor Testing
    • Analytical Testing
    • Power Quality Monitoring
  • Electrical Power System Studies: Arc flash, short circuit, power flow, power quality, and coordination studies.
  • Fire and Explosion Investigations
  • Business Interruption Investigation
    • Incidents Related to Business Interruption and Production Loss
    • Subrogation Support
  • Building Mechanical System Failures:
    • HVAC and associated piping systems
    • PLC and BAS Failures
    • Diesel and Fuel System Failures
  • Lab and Testing:
    • Virtual Lab Technology: Computerized electrical system failure simulation.

 

Our comprehensive forensic engineering services help clients understand technical failures and incidents, enabling informed decision-making and effective resolution strategies.

Send an Inquiry

Get exclusive updates and insights!

Get notified about new articles