Forensic Engineering
Forensic engineering is a specialized field that demands experience, knowledge, and advanced technology. At Mission Critical Engineers, we offer cross-disciplinary forensic investigative services across essential engineering disciplines. With extensive experience and cutting-edge technology, our experts deliver top-tier forensic engineering services to clients, including insurance companies, legal firms, public utilities, manufacturers, facility owners, and industrial sectors. Our focus on data center and mission-critical engineering enables us to provide unique forensic investigation services to this sector.
Our Areas of Expertise:
- Failure Analysis: Investigating the root causes of structural, electrical, and mechanical failures to prevent recurrence and enhance future designs.
- Damage Assessment: Evaluating damage to critical infrastructure and providing detailed reports for restoration and claims processing.
- System Performance Evaluation: Analyzing data center systems to identify inefficiencies and recommend improvements.
- Risk Mitigation: Developing strategies to minimize risks and enhance the resilience of mission-critical facilities.
- Compliance and Standards Review: Ensuring adherence to industry standards and regulatory requirements.
- Incident Investigation: Conducting thorough investigations to determine the causes and accountability of incidents affecting data center operations.
- Expert Testimony: Providing expert analysis and testimony in legal proceedings related to engineering failures.
Comprehensive Forensic Services:
- Data Center Downtime Analysis:
- Investigating causes of service loss and productivity issues.
- Root Cause Analysis: Examining failures like power and cooling loss to critical IT loads.
- Reliability and Availability Assessment
- Battery Energy Storage System (BESS) Failures
- Solar and Wind Farm Electrical System Failures
- EV Charging Station Failures
- Electrical Failures:
- Low, medium, and high-voltage power supply and distribution equipment
- Switchgear, transformers, underground cables, overhead powerlines
- Power distribution equipment, panelboards, pull boxes, bus ducts, cables
- Uninterrupted Power Units (UPS)
- Motor Control Centers
- Energy Storage Systems (battery systems and units)
- Power generation and distribution control and monitoring systems
- Electrically induced arcing and fire incidents
- Fire and explosions involving electrical systems/equipment
- Lightning strike incidents and damage
- Compliance with Canadian/Ontario electrical codes and standards
- Incidents caused by utility power surges and distribution faults
- Electrical motor and generator failures (utility substations and plants)
- Control and alarm system analysis (fire detection, security, fire suppression, environmental monitoring)
- Product liability (equipment, appliances, electronics)
- Injuries from electrical incidents (electrocution, electric shock)
- Renewable energy systems (solar power, wind farm equipment)
- Agricultural equipment and greenhouse control malfunctions
- Neon and LED sign fires
- Fires of HID and fluorescent light circuits/ballasts
- Loss events caused by static electricity
- Field Testing and Evaluation:
- Transformer and Cable Conductor Testing
- Analytical Testing
- Power Quality Monitoring
- Electrical Power System Studies: Arc flash, short circuit, power flow, power quality, and coordination studies.
- Fire and Explosion Investigations
- Business Interruption Investigation
- Incidents Related to Business Interruption and Production Loss
- Subrogation Support
- Building Mechanical System Failures:
- HVAC and associated piping systems
- PLC and BAS Failures
- Diesel and Fuel System Failures
- Lab and Testing:
- Virtual Lab Technology: Computerized electrical system failure simulation.
Our comprehensive forensic engineering services help clients understand technical failures and incidents, enabling informed decision-making and effective resolution strategies.