Reliability Assessment

Uncovering Hidden Risks:
Proactive Insights for Maximum Availability

Data centre reliability assessment in progress by engineers

Evaluating Infrastructure For Proactive Protections:
Comprehensive Reliability Assessment of Critical Facilities

The Core of Reliability Assessment

Reliability forms the backbone of all mission critical facilities. Mission Critical Engineers (MCE) conducts comprehensive reliability assessments for critical infrastructure and mission critical systems, providing proactive insights for continuous operation. These assessments rigorously evaluate the resilience of both new and existing data centre infrastructure under real-world conditions. The goal is to ensure continuous operation, optimize performance, availability, and resilience. Detailed engineering analysis offers actionable recommendations to enhance reliability, prevent potential failures, and deliver clear, data-driven strategies to maximize uptime and ensure operational confidence.

Scope of Assessment: Systems and Areas Evaluated

  • Site Location Impact Analysis: Assessing environmental and geographical factors to understand their potential influence on infrastructure performance and resilience, ensuring preparedness for local challenges.
  • Public Utility Services Evaluation: A thorough review of the reliability and quality of essential services, such as power, water, and gas, to pinpoint potential vulnerabilities.
  • On-Site Power Generation System Review: Inspection of all backup power solutions, including generators and other on-site sources, to verify their reliable support during utility interruptions.
  • Uninterruptible Power Supply (UPS) System Assessment: Comprehensive review of UPS systems to confirm their capability in providing continuous, uninterrupted power, thereby safeguarding against disruptions.
  • Power Distribution Analysis: Evaluation of the entire power distribution infrastructure to confirm efficient and reliable delivery of power to all IT loads and mission-critical systems.
  • Cooling Systems Examination: Assessment of all cooling components, including cooling plants and critical space cooling units, to ensure heat-sensitive equipment operates at optimal temperatures.
  • Architectural Layout and Features Review: Assessment of the data centre’s design and layout to verify effective support for efficient operations, emergency management protocols, and overall performance.
  • Building Automation & Management Systems (BMS) Review: Analysis of BMS effectiveness in optimizing operational efficiency and energy consumption throughout the facility.
  • Fire Detection and Suppression Systems Check: A thorough review of fire safety systems to confirm comprehensive protection, rapid detection capabilities, and efficient suppression mechanisms.
  • IT-Supportive Areas Inspection: Inspection of all IT support areas to ensure they consistently meet essential operational requirements.
  • Telecommunication Facilities Assessment: Evaluation of telecommunication infrastructure to ensure uninterrupted connectivity and seamless data flow.
  • Ancillary Systems Analysis: Review of auxiliary systems that support overall data centre operations to identify opportunities for improving both reliability and operational efficiency.
  • Critical Systems Evaluation: Assessment of the overall condition of critical equipment and interconnected systems, including building envelopes, robust fire protection measures, and resilience against natural disaster risks.

Analytical Focus: Key Evaluation Areas

The assessment incorporates robust analytical approaches, specifically focusing on evaluating the facility against stringent industry standards for Capability, Robustness, Resilience, Availability, Reliability, and Operational Efficiency. Key areas of in-depth evaluation include:

A detailed evaluation of the design and current condition of all critical electrical and mechanical systems, encompassing utility feeds, switchgear, UPS units, generators, chillers, CRACs/CRAHs, cooling towers, and associated piping.

Verification that implemented redundancy configurations (N, N+1, 2N, etc.) align precisely with specified requirements, such as intended Tier levels, and can effectively manage component failures.

Precise identification of any potential single points of failure present anywhere within the infrastructure that could lead to widespread disruption.

A thorough review of existing maintenance programs, emergency operating procedures (EOPs), and the overall preparedness of facility staff.

Comprehensive assessment of environmental factors, physical security measures, and the facility’s resilience against various external threats, including utility outages and natural disasters.

Detailed analysis of current and projected IT loads against the designed and actual operational capacity of all critical systems.

A meticulous assessment of the integrity, redundancy, and capacity of all electrical systems throughout the facility.

Evaluation of the robustness and efficiency of the cooling infrastructure to ensure sustained uptime and optimal thermal management.

Modeling of various potential failure points and scenarios to proactively identify weaknesses and strengthen overall system resilience.

In-depth analysis of existing failover processes and the overall readiness for effective disaster recovery.

Methodology: The Assessment Process

A detailed examination of all relevant design drawings, technical specifications, operation and maintenance (O&M) manuals, and previous testing reports.

Comprehensive on-site evaluations to verify physical conditions, equipment installation, and operational practices.

Where feasible, direct observation of system testing procedures to validate performance and functionality.

In-depth discussions with facility personnel to gather insights into operational procedures, challenges, and historical data.

Application of the team’s extensive experience gained from countless data centre assessments and reviews.

Deliverables: Findings and Actionable Insights

This report comprehensively outlines all findings from the assessment. Within it, risks are clearly identified and meticulously categorized by severity to prioritize mitigation efforts.

These recommendations are specifically designed for enhancing reliability, effectively mitigating identified risks, and optimizing overall performance. All recommendations are practical and carefully consider existing budgetary and operational constraints.

Clear, data-driven strategies are provided to effectively maximize uptime and instill complete operational confidence. MCE’s core focus remains on significantly enhancing data centre performance, ensuring it operates seamlessly with minimal downtime.