Where uptime is engineered Independent data centre engineering and commissioning.

Independent CxA, AI readiness and failure-risk engineering for data centres where downtime is not an option.

What we do

Independent data centre engineering and commissioning services.

AI readiness, upgrades, design review, commissioning and power resilience for critical facilities.

01

AI Readiness Review

Assess whether existing power, cooling, structure, network and controls can support the target AI workload.

Decision: Can this facility support AI?
02

AI Upgrade & Retrofit

Plan and validate phased upgrades to power, cooling and controls in operating facilities.

Decision: How do we modernize without disrupting operations?
03

Data Centre Design Review

Review topology, redundancy, interfaces and commissionability before construction commits the design.

Decision: Should this design proceed?
04

Commissioning Authority (CxA)

Owner-side CxA services from design review through witnessed integrated systems testing.

Decision: What proof supports acceptance?
05

Site Power Strategy

Assess utility supply, interconnection, on-site generation, BESS and resilience constraints for data-centre sites.

Decision: Can this site secure and maintain power?

MCX™ Commissioning Platform

The complete platform for data centre commissioning.

MCX™ runs the test program, field execution, deficiencies, witnessed acceptance, and turnover on one controlled record.

Engage MCE as your Commissioning Authority and the platform comes with the work. Sign-in is by invitation.

MCX™ / Commissioning Levels L0–L5

From design review to turnover

  1. L0Design Review
  2. L1Factory Testing
  3. L2Delivery & Installation
  4. L3Pre-Functional & Startup
  5. L4Functional Performance Testing
  6. L5Integrated Systems Test
Commissioning services

How we work

Identify risks. Control them. Prove performance.

MCE connects failure analysis, engineering decisions and commissioning verification.

01

Identify failure risks

Review topology, interfaces, operating conditions and known failure modes.

02

Control design and operations

Resolve design, commissioning and operational risks before work proceeds.

03

Verify under real conditions

Test the facility individually, collectively and under simulated failure conditions.

04

Record verified results

Provide the owner with verified results, exceptions, residual risk and review triggers.

Representative deliverables

Data centre engineering and commissioning deliverables.

Illustrative formats show the structure and depth of MCE’s work without exposing client information.

Who we serve

For people responsible for critical facilities.

Owners, operators, developers and risk professionals use MCE for design, commissioning, reliability and site-power decisions.

01

Data-centre owners and operators

AI readiness, commissioning, reliability and operational decisions.

02

Developers and project teams

Design review, power strategy and owner-side commissioning.

03

Insurers, counsel and risk professionals

Failure analysis and technical investigation support.

Why MCE

Why Work With MCE

We know why data centres fail — and take the risks out before they are built

We know how a data centre works. We know what puts its uptime at risk. We have investigated the failures. We take those risks out at design review, before anything is built.

The whole facility as one system

Power, cooling, controls and structure are verified together. Failures happen at the seams; that is where we look.

Hyperscale and liquid-cooled

Gigascale campuses and liquid cooling, verified as systems that must stay online — not as equipment that must switch on.

We test the conditions the facility will actually meet

At full load. At a load step. With a critical unit out of service. With a valve leaking, a breaker tripped, the utility gone. The facility proves itself under those conditions, or it has not been proved.

Truly independent

We hold no interest in the design, the construction or the equipment. Only the owner’s. That is what makes our findings a basis for acceptance.

One record, on a platform built by CxA for CxA

The whole test program, ready on Day 1. Checklists and test scripts engineered to MCE’s commissioning standard. Your project data is handled by your team.

Start with the decision

Planning an AI upgrade, critical build or retrofit?

Engage MCE before the design hardens, the cutover is scheduled, or acceptance records become a dispute.