Data Centre / AI Upgrade & Retrofit

AI Upgrade & Retrofit for Data Centres Upgrade an operating facility for AI.

MCE plans, validates and commissions phased power, cooling and controls upgrades while the data centre continues running.

Live-site awareOwner-sidePhasedVerification-led
Illustrative air-cooled and liquid-cooled AI data halls side by side, identifying details intentionally obscured
Air-cooled data hall (left) and liquid-cooled AI data hall (right). Illustrative; identifying details intentionally obscured.

What you get

AI upgrade and retrofit deliverables.

01

A phased implementation plan

The upgrade broken into practical stages that protect existing operations, with dependencies and hold points set out.

02

Detailed design

The detailed design for each change and the procedures for each cutover, checked against the operating facility before work proceeds.

03

Commissioning results

Test results for every new and changed system, from pre-functional checks to integrated testing, before it carries live load.

04

An accepted performance record

The owner’s acceptance record, updated with verified results and closed exceptions.

What is in our scope

Power, cooling and controls upgrades for data centres.

MCE supports the owner through the technical decisions and verification points that keep a live retrofit controlled.

01

Power upgrades

Review distribution, UPS, PDU capacity, switchgear changes, protection settings and staged energization.

02

Cooling upgrades

Review liquid-cooling readiness, plant changes, coolant distribution, heat rejection and failure response.

03

Controls and monitoring

Review metering, alarms, sequences, leak detection, automation and operational visibility before cutover.

How it works

Data centre retrofit stages, from plan to acceptance.

01

Plan

Confirm the target workload, affected systems, operating constraints and the sequence of phases.

02

Detailed design

The detailed design for each change is developed and checked against the operating facility, with its method statements, before procurement and construction.

03

Construction

Observe installation at defined points so the changes are built as designed before anything connects to live systems.

04

Commissioning

Witness pre-functional, functional and integrated testing of each new and changed system before it carries live load.

05

Cutover

Support owner review at each hold point through isolation, transfer, energization and recovery, under MOPs, SOPs and EOPs with defined abort conditions and rollback paths.

06

Acceptance

Confirm the upgraded systems operate as intended, close exceptions and update the owner’s record of accepted performance.

Who this is for

AI retrofit services for operating data centres.

Data-centre owners and operators

Move from AI-readiness findings into controlled implementation.

Colocation and managed-service teams

Phase tenant-facing AI capacity without unnecessary disruption.

Developers and project teams

Keep owner-side technical control during retrofit design and delivery.

What this is not

Independent review.
Clear limits.

Not construction management

MCE does not direct contractor means, methods or site execution.

Not equipment supply

MCE remains independent of cooling, power and IT equipment interests.

Questions

AI upgrade and retrofit questions.

Can upgrades proceed while the facility is operating?

Yes. The work is planned around live operations, with stage boundaries, readiness checks and rollback conditions.

How are detailed design and MOPs handled?

They are developed for each phase and checked from the owner’s side before critical work proceeds.

Does MCE direct contractors?

No. MCE does not direct contractor means and methods.

How is a successful upgrade verified?

Through commissioning of every changed system: defined performance checks, witnessed results, exception closure and an updated acceptance record.

Start the upgrade

Implement AI capacity without losing control of the facility.

Engage MCE before the first cutover is scheduled or the design is released for construction.