Careers at Mission Critical Engineers

Mechanical Commissioning Associate — Toronto, ON

📍 Toronto, ON 🕐 Full-time 🏗 Office and project-site based ✈ Travel: 15–30% Reports to: Lead Data Centre Commissioning Engineer & Project Manager

The Position

Mission Critical Engineers is seeking a Mechanical Commissioning Associate to support the field execution of commissioning activities on complex data centre and mission-critical projects.

The Mechanical Commissioning Associate will work alongside the Lead Data Centre Commissioning Engineer & Project Manager and the commissioning team during system startup, test preparation, functional testing, integrated systems testing, and turnover.

The role requires a solid understanding of mechanical systems, cooling infrastructure, controls, and system interdependencies, together with strong attention to detail, technical documentation skills, and the ability to work effectively with clients, contractors, OEMs, engineers, and project teams.

Responsibilities

  • Support and actively participate in L1–L5 commissioning activities, including factory acceptance testing, site acceptance testing, installation verification, pre-functional testing, functional performance testing, and integrated systems testing.
  • Participate in field verification, testing, troubleshooting, and documentation of mechanical systems.
  • Take field measurements with mechanical test instruments, including temperature and pressure data loggers, ultrasonic flow meters, airflow and velocity meters, and infrared thermography cameras, and record the results accurately.
  • Assist with commissioning critical cooling infrastructure, including chillers, cooling towers, pumps, CRAH/CRAC units, air-handling systems, CDUs, liquid-cooling systems, hydronic systems, BMS, controls, alarms, and interlocks.
  • Support verification of mechanical-system redundancy, control sequences, alarms, failover, recovery, maintainability, and response to abnormal operating conditions.
  • Review mechanical drawings, specifications, submittals, equipment documentation, test procedures, control sequences, and operating manuals.
  • Read and interpret mechanical drawings, P&IDs, control diagrams, sequences of operation, specifications, and equipment manuals.
  • Conduct site inspections and verify system installation, test readiness, and completion of pre-functional requirements.
  • Assist with the development, review, and execution of test plans, test scripts, checklists, test matrices, and acceptance criteria.
  • Support testing of BMS points, alarms, monitoring, interlocks, equipment safeties, automatic sequences, and system response.
  • Attend commissioning, test-readiness, and technical coordination meetings with clients, contractors, OEMs, consulting engineers, and MCE personnel.
  • Coordinate with contractors and OEM representatives during equipment startup, testing, issue resolution, and documentation review.
  • Maintain accurate test records, site observations, deficiency logs, meeting minutes, and project-status updates.
  • Support test-day logistics, including site access, equipment availability, safety controls, temporary loads, required documentation, and OEM attendance.
  • Assist in tracking deficiencies, verifying corrective actions, and confirming readiness for subsequent testing stages.
  • Support owner training, turnover documentation, and transition of systems to the facility operations team.
  • Follow MCE and project safety requirements at all times.
  • Work from the Toronto office and project sites as required, with travel to client and project locations across Canada.
  • Perform other duties and support other project activities as assigned from time to time by the Lead Data Centre Commissioning Engineer & Project Manager, CxA Principal, or senior management.

Qualifications

  • Diploma or bachelor’s degree in Mechanical Engineering, Mechanical Engineering Technology, Building Systems Engineering, or a related discipline.
  • Experience in mechanical construction, testing, commissioning, design, operations, maintenance, or related technical work is preferred.
  • Foundational understanding of HVAC, hydronic, cooling, controls, and mechanical-system operation.
  • Familiarity with redundancy, availability, resilience, failover, and recovery concepts in mission-critical environments.
  • Ability to read and interpret mechanical drawings, P&IDs, control diagrams, specifications, and equipment manuals.
  • Strong attention to detail, organization, and technical documentation skills.
  • Strong written and oral communication skills, including the ability to prepare clear technical notes, test records, and reports.
  • Collaborative, dependable, and professional approach; able to work independently in the field and effectively within a multidisciplinary team.
  • Proficiency with Microsoft Office and relevant engineering, analysis, or documentation software.
  • Ability to work safely in active construction and mission-critical environments.
  • Valid driver’s licence and ability to travel 15–30% as required.

Preferred Qualifications

  • Experience in data centres, healthcare, industrial, laboratory, utility, or other mission-critical environments.
  • Experience with chilled-water systems, cooling towers, CRAH/CRAC units, air-handling systems, liquid cooling, CDUs, BMS, or data centre cooling infrastructure.
  • Hands-on use of mechanical test instruments such as ultrasonic flow meters, data loggers, or airflow meters.
  • Familiarity with commissioning processes and L1–L5 testing.
  • Eligibility for registration with Professional Engineers Ontario is an asset.

Working Conditions

  • Regular site work on active construction sites and in operating facilities, including electrical rooms, mechanical plants, generator yards, and rooftops.
  • Walking and standing actively on site for up to 8 hours a day, including climbing stairs and ladders.
  • Lifting and carrying test equipment and materials weighing up to 50 lb (23 kg).
  • Wearing arc-rated clothing and other personal protective equipment as required by MCE and site safety rules.
  • Occasional evening, overnight, or weekend work when systems can be tested only outside normal operating hours.
  • Work in noisy equipment areas and outdoors in all seasons.

What We Offer

  • Extensive hands-on data centre commissioning experience, from factory testing through integrated systems testing and handover.
  • Direct mentorship from the CxA Principal and senior commissioning engineers.
  • Clear opportunities for career advancement.
  • Performance bonus.
  • Group health and dental benefits.

About Mission Critical Engineers

Mission Critical Engineers is an independent engineering and Commissioning Authority firm specializing in data centres, high-availability infrastructure, and forensic engineering.

We support clients through design review, construction verification, commissioning, reliability assessment, failure analysis, and operational handover. Our work covers critical electrical and mechanical infrastructure, including power distribution, standby generation, UPS and battery systems, air and liquid cooling, controls, fire suppression, and life-safety systems.

Applicants must be legally entitled to work in Canada at the time of application.

Only candidates selected for an interview will be contacted.

Mission Critical Engineers is an equal-opportunity employer. We are committed to an inclusive and accessible workplace. Accommodations are available throughout the recruitment process in accordance with applicable law.

Interested in this role?

Send your application to our HR team — please reference the position title in your subject line.

Apply for this position
hr@missioncriticalengineers.com

Download “BESS Fire & Explosion Risk Brochure”

Download the Critical Incident Response Checklist

Download the Public Procurement Commissioning Toolkit

Download Reliability Assessment Capabilities

Download AI Data Centre Commissioning Qualifications

Download white paper: Mastering Phase Rotation: OESC Compliance, Safety, and Operational Integrity

Engineering Uptime: Mitigating Risk in High-Density GPU Deployments

Get the latest insights and updates — sign up for our newsletter!