Electrical Harmonics Explained: Causes, Effects and Mitigation

What electrical harmonics are, where they come from, how a current problem becomes a voltage problem, what they do to equipment, why the 3rd harmonic overloads neutrals, and how to mitigate them.

By Team@MCE August 7, 2024 10 min read
Graph: the fundamental sine wave, the third harmonic, and the distorted waveshape they produce together
On this page
  1. 1. What Are Electrical Harmonics?
  2. 2. What Causes Harmonics? Linear vs Non-Linear Loads
  3. 3. How Harmonic Currents Distort the Voltage
  4. 4. Inside Two Common Non-Linear Loads: The SMPS and the VFD
  5. 5. Effects of Harmonics on Electrical Systems and Equipment
  6. 6. The 3rd Harmonic and Triplen Harmonics in Three-Phase Systems
  7. 7. How to Mitigate Harmonics
  8. Summary
  9. Frequently Asked Questions

Key takeaways

  • Harmonics are voltages or currents at whole multiples of the fundamental frequency (50 or 60 Hz).
  • Non-linear loads (computers and servers, VFDs, LED lighting, UPS systems and EV chargers) draw distorted current; linear loads do not generate harmonics.
  • Voltage harmonics are the result of current harmonics flowing through the impedance of transformers and wiring.
  • Harmonics cause overheating, nuisance tripping, equipment malfunction and motor vibration and, in three-phase four-wire systems, dangerously high neutral currents.
  • They are managed with filters, K-rated transformers, load management, proper design and IEEE 519.

Modern alternating current (AC) power systems are designed to deliver electrical energy using a perfect, smooth sinusoidal voltage waveform at a constant frequency, typically 50 or 60 Hz. This ideal sine wave represents the most efficient and stable state for the power grid.

However, the reality in our modern world is that this pristine waveform is often corrupted by distortions. The most persistent and problematic of these distortions are electrical harmonics. But what exactly are harmonics, how are they generated, and what impact do they have on electrical systems and equipment?

1. What Are Electrical Harmonics?

As defined by the Institute of Electrical and Electronics Engineers (IEEE), harmonics are sinusoidal voltages or currents with frequencies that are integer multiples of the fundamental frequency. For most AC systems, the fundamental frequency is either 50 Hz or 60 Hz, depending on the region. For example, in a 60 Hz system:

  • 1st harmonic: the fundamental frequency, the intended 60 Hz sine wave.
  • 2nd harmonic: twice the fundamental frequency (120 Hz).
  • 3rd harmonic: three times the fundamental frequency (180 Hz), and so on.

These unwanted harmonic components superimpose themselves onto the fundamental waveform, creating a new, distorted, non-sinusoidal wave. Using a mathematical tool called the Fourier series, power quality analyzers can deconstruct any complex, distorted waveform back into its simple sine wave components, allowing engineers to measure its harmonic content precisely.

The graph at the top of this article illustrates the fundamental sine wave and the 3rd harmonic. The distortion caused by the 3rd harmonic results in the overall waveform deviating from the ideal sine wave.

2. What Causes Harmonics? Linear vs Non-Linear Loads

Harmonics are primarily generated by non-linear loads in the electrical system.

The source of harmonic distortion can be traced to a fundamental division in the types of electrical loads connected to the power system. The key lies in how a load’s impedance behaves in response to the applied voltage.

Linear loads (incandescent bulbs, heaters, induction motors) beside non-linear loads (switch-mode power supplies, LED drivers, VFDs, UPS, electronic ballasts, battery chargers)
Linear loads: current follows the voltage waveform. Non-linear loads: current does not follow the voltage waveform.

Linear Loads

A linear load is defined by its constant impedance, which does not change with the voltage applied to it. This means the relationship between voltage and current is consistently proportional and follows Ohm’s Law (I=V/Z) at every instant. When you apply a pure sinusoidal voltage from the utility to a linear load, it draws a current that is also a pure, undistorted sinusoid of the same frequency. While some linear loads like motors and capacitors introduce a phase shift between voltage and current, they do not alter the fundamental sinusoidal shape.

Examples include incandescent light bulbs, simple electric heaters, and AC motors. Because they maintain the integrity of the waveform, linear loads do not generate harmonics.

Non-Linear Loads

In stark contrast, a non-linear load is one whose impedance changes as a function of the instantaneous applied voltage. For these loads, the current drawn is not directly proportional to the voltage at every point in the AC cycle. This non-linear relationship is the fundamental cause of harmonic generation. When a pure sinusoidal voltage is applied, the varying impedance causes the device to draw a non-sinusoidal, distorted current.

Non-linear loads draw current in a non-linear manner, meaning the current waveform does not follow the voltage waveform.

The vast majority of modern electronic equipment falls into this category, including:

  • Computers and servers (using switch-mode power supplies), printers and other office equipment.
  • Power electronics: rectifiers, inverters and variable frequency drives (VFDs).
  • Lighting: LED lights and fluorescent lamps with electronic ballasts.
  • Uninterruptible power supplies (UPS): systems providing emergency power to loads.
  • EV chargers.

These devices operate by creating sharp changes in current, which generate harmonics.

3. How Harmonic Currents Distort the Voltage

It’s essential to understand that non-linear loads are fundamentally harmonic current drawers, not voltage generators. The creation of system-wide voltage distortion is a clear, sequential process:

  1. Clean voltage in: The utility supplies a voltage waveform (Vsource) that is a nearly perfect sinusoid.
  2. Distorted current out: Due to its changing impedance, the non-linear load draws a non-sinusoidal current (Iload), which is composed of the fundamental current plus a series of harmonic currents.
  3. Flow through system impedance: This distorted current must travel from the utility to the load through the power distribution network (transformers, wiring), which has an inherent physical impedance (Zsys).
  4. Harmonic voltage drops created: According to Ohm’s Law, as each individual harmonic current component (Ih) flows through the system impedance (Zsys), it creates a corresponding voltage drop at that harmonic frequency (Vh = Ih × Zsys).
  5. System voltage becomes distorted: The final voltage observed by all equipment at the point of connection is the original source voltage minus the sum of all these harmonic voltage drops. The result is a distorted, non-sinusoidal voltage waveform for all connected users.

This causal chain clarifies a critical concept: voltage harmonics are the result of current harmonics.

4. Inside Two Common Non-Linear Loads: The SMPS and the VFD

To fully grasp this, let’s examine the components inside two of the most common non-linear loads.

The Switch-Mode Power Supply (SMPS)

Found in nearly every piece of digital equipment from PCs to EV chargers, the SMPS is perhaps the most ubiquitous non-linear load. Its design perfectly illustrates harmonic generation.

  • The mechanism: An SMPS front-end uses a diode bridge rectifier followed by a large DC bus capacitor. The critical non-linear action is that the input rectifier diodes will only conduct and draw current from the AC line when the instantaneous AC input voltage is higher than the voltage already stored on the capacitor.
  • The result: This condition is only met for a very brief period near the positive and negative peaks of the AC voltage sine wave. As a result, the SMPS draws current in short, high-amplitude pulses that occur twice per cycle. This severely distorted current is rich in odd harmonics, particularly the 3rd, 5th, and 7th. When millions of these devices operate on a grid, their simultaneous current draw at the voltage peaks can cause a significant voltage drop, leading to a distortion known as “flat topping” of the voltage waveform.

The Three-Phase Variable Frequency Drive (VFD)

VFDs are essential in industrial settings for providing efficient speed control of AC motors. A standard 6-pulse VFD uses a six-diode bridge rectifier as its input stage.

  • The mechanism: This rectifier converts the incoming three-phase AC power to a DC voltage. In doing so, it draws current from the AC lines in six distinct, non-sinusoidal pulses per cycle, creating a distorted input current waveform that pollutes the power grid.
  • The result: For a 6-pulse VFD, this process generates characteristic harmonics of the 5th, 7th, 11th, 13th, 17th, 19th, and so on. (Notably, triplen harmonics like the 3rd are mathematically cancelled in a balanced three-phase system.) The output stage of the VFD uses high-frequency switching to control the motor, but these effects are largely confined to the VFD-to-motor circuit and are distinct from the low-order harmonics injected back into the power grid.

5. Effects of Harmonics on Electrical Systems and Equipment

Harmonic distortion is not just a theoretical issue; it’s a form of electrical pollution with tangible and costly consequences. The harmonic currents flowing through a system do not contribute to useful work but create a range of problems.

  • Increased heating and losses: Harmonics add to the overall root mean square (RMS) current in an electrical system. This increases the total heating effect (I2R losses) in all components, leading to overheating, reduced efficiency, and a shortened operational life for critical equipment like transformers, conductors, and motors.
  • Reduced efficiency: The presence of harmonics can cause losses in electrical machines and equipment, reducing their efficiency and increasing operating costs.
  • Overloading: Distribution systems can become overloaded due to the increased RMS current, potentially causing protective devices like circuit breakers to trip unnecessarily.
  • Equipment malfunction: Voltage distortion can wreak havoc on sensitive electronics, causing issues like timing errors in control systems, nuisance tripping of circuit breakers, misfiring of other variable frequency drives (VFDs), and interference with telecommunication networks.
  • Torque pulsations in motors: In motors and generators, the interaction between harmonic currents and the fundamental magnetic field can create pulsating or oscillating torques. These pulsations cause mechanical vibrations, increased audible noise, and accelerated wear on bearings and couplings.
  • Resonance: Harmonics can lead to resonance conditions, where the system’s impedance becomes very high at certain frequencies, exacerbating the effects of harmonics and leading to voltage distortion and equipment damage.

6. The 3rd Harmonic and Triplen Harmonics in Three-Phase Systems

The 3rd harmonic, which is three times the fundamental frequency, is particularly problematic in three-phase power systems. In a 60 Hz system, the 3rd harmonic frequency would be 180 Hz. 3rd harmonics are of zero sequence, meaning the 3rd harmonic components in each phase are in phase with each other.

How 3rd Harmonics Are Generated

3rd harmonics are often generated by:

  • Single-phase non-linear loads: Multiple single-phase loads connected to a three-phase system can cause the 3rd harmonic component from each phase to add up in the neutral conductor.
  • Electronic ballasts in lighting: These often draw non-sinusoidal current that includes significant 3rd harmonic content.

Effects of 3rd Harmonics

  • Neutral conductor overloading: In the common three-phase, four-wire “wye” systems found in commercial buildings, the odd triplen harmonics (3rd, 9th, 15th, etc.) generated by numerous single-phase loads like computers and lighting do not cancel each other out in the neutral conductor. Instead, they are additive. This can cause the current in the neutral wire to become dangerously higher than in the phase conductors, creating a severe fire hazard.
  • Transformer heating: Transformers can experience increased heating due to 3rd harmonics. In particular, delta-wye transformers can have circulating currents in the delta winding due to 3rd harmonics, leading to additional losses and heating.
  • Voltage distortion: 3rd harmonics can cause significant voltage distortion, leading to malfunction of sensitive equipment and misoperation of protective relays.

7. How to Mitigate Harmonics

To maintain the reliability and efficiency of electrical systems, mitigating harmonics is crucial. Here are some common methods:

  • Passive filters: Used to block or filter out specific harmonic frequencies.
  • Active harmonic filters: Devices that actively inject currents to cancel out harmonic components.
  • K-rated transformers: Designed to handle the additional heating caused by harmonics.
  • Proper load management: Distributing non-linear loads more evenly across phases and minimizing their usage can reduce harmonic generation.

The challenge is not to eliminate the indispensable non-linear loads that define modern life, but to intelligently manage their interaction with the power system through proper design, filtering, and adherence to established standards like IEEE 519.

Summary

The generation of harmonics in modern electrical systems is not an anomaly but an inherent and predictable consequence of the technology that powers our world. The causal chain is clear:

  1. High-efficiency power conversion relies on semiconductor switches (diodes, transistors).
  2. The switching action of these components is fundamentally non-linear, causing them to draw current in distorted, pulsed waveforms.
  3. These non-sinusoidal currents, rich in harmonics, are injected into the power grid.
  4. As they flow through the impedance of transformers and wires, they create harmonic voltage drops that corrupt the system’s voltage for all users.

Understanding and managing harmonics is essential to ensuring the longevity of equipment, maintaining system reliability, and preventing potential safety hazards. By addressing harmonics, we can move closer to achieving the ideal sinusoidal current flow in AC systems.

Frequently Asked Questions

What causes harmonics in an electrical system?

Harmonics are generated by non-linear loads: equipment whose impedance changes as a function of the instantaneous applied voltage, so it draws a non-sinusoidal, distorted current. The vast majority of modern electronic equipment falls into this category, including computers and servers, variable frequency drives (VFDs), LED and fluorescent lighting, uninterruptible power supplies (UPS) and EV chargers. Linear loads do not generate harmonics.

Do harmonics come from the current or the voltage?

Non-linear loads are fundamentally harmonic current drawers, not voltage generators. As each harmonic current flows through the impedance of transformers and wiring, it creates a voltage drop at that harmonic frequency, distorting the voltage for all connected users. Voltage harmonics are the result of current harmonics.

Why does the 3rd harmonic overload the neutral conductor?

3rd harmonics are of zero sequence: the 3rd harmonic components in each phase are in phase with each other. In three-phase, four-wire systems, the triplen harmonics generated by single-phase loads like computers and lighting do not cancel each other out in the neutral conductor. Instead, they are additive, and the neutral current can become dangerously higher than in the phase conductors.

How are harmonics measured?

Using a mathematical tool called the Fourier series, power quality analyzers can deconstruct any complex, distorted waveform back into its simple sine wave components, allowing engineers to measure its harmonic content precisely.

How can harmonics be reduced?

Common methods are passive filters, active harmonic filters, K-rated transformers and proper load management, distributing non-linear loads more evenly across phases. The aim is to manage the interaction of non-linear loads with the power system through proper design, filtering, and adherence to established standards like IEEE 519.

If you suspect the issues described in this article are impacting your facility, contact our team for a professional power quality assessment. For more expert insights and practical guides on power quality, be sure to .

Related reading: Understanding Power Quality and Power Factor Explained.

Have a data centre project in planning?

Tell us about your project, and we will come back to you.

Send your project request

Share the Post:

Related Posts

May 12, 2026

Load Tap Changers: How Transformers Regulate Voltage Under Load

How on-load tap changers regulate transformer voltage under load: the turns ratio, the two-stage switching sequence, resistor, reactor and vacuum…

Read More »
April 9, 2026

Data Centre Transformer Protection: The Critical Role of the 87T Differential Relay

As AI data centres deploy hundreds of medium-voltage transformers, electrical protection has shifted from a substation specialty to mission-critical infrastructure…

Read More »
September 2, 2025

Mastering Phase Rotation: OESC Compliance, Safety, and Operational Integrity

A technical white paper on phase rotation in three-phase systems in Ontario: the principles, a risk hierarchy of equipment, the…

Read More »