Request Consultation
Insights

Electric Fundamentals

12 articles

Independent research on power, cooling, interconnection and failures in AI-scale data centres. Mission Critical Research
Electric Fundamentals Guide

Load Tap Changers: How Transformers Regulate Voltage Under Load

How on-load tap changers regulate transformer voltage under load: the turns ratio, the two-stage switching sequence, resistor, reactor and vacuum transition elements, and what the mechanism means for maintenance and condition monitoring.

May 12, 2026
Data Centre Guide

Data Centre Transformer Protection: The Critical Role of the 87T Differential Relay

As AI data centres deploy hundreds of medium-voltage transformers, electrical protection has shifted from a substation specialty to mission-critical infrastructure design. Explore the complete transformer protection stack and the engineering mechanics of the 87T differential relay.

April 9, 2026
Electric Fundamentals

Mastering Phase Rotation: OESC Compliance, Safety, and Operational Integrity

A technical white paper on phase rotation in three-phase systems in Ontario: the principles, a risk hierarchy of equipment, the OESC provisions that apply, a five-part field verification process, and the economic and legal stakes.

September 2, 2025
Data Centre

Generator Power Ratings Explained: Standby, Prime and Continuous

How a generator works, kW vs kVA, the difference between standby, prime and continuous duty ratings, derating for temperature and altitude, and how to select a generator.

December 31, 2024
Electric Fundamentals

Common Electrical Conductor Types and Applications: A Quick Guide for Engineers

Copper and aluminum conductors compared, and the common electrical conductor types by insulation, configuration, environmental rating and ampacity, with typical applications for each.

November 12, 2024
Electric Fundamentals

Transformer Fundamentals: Principles, Types, and Applications

How transformers work, the turns ratio and efficiency, the main types by voltage level and insulation medium, and their applications from power generation to buildings.

October 16, 2024
Data Centre Guide

Understanding Transfer Switches: Types, Applications, and Design Considerations

Manual, automatic, breaker pair and static transfer switches: how each works, open, closed and delayed transition, SCR and IGBT switching, what IT loads need, and how to design and maintain them.

September 10, 2024
Data Centre Guide

Electrical System Protection for Critical Facilities: Is Your Power Ready?

The goals of an electrical system, the hierarchy of protection, the abnormal conditions it guards against, and the protection devices that keep data centres and hospitals safe and running.

September 5, 2024
Electric Fundamentals

Beyond the Surface: Understanding the Vital Roles of Grounding and Bonding

Why grounding matters even when a system seems to run without it, how grounding differs from bonding under the Canadian Electrical Code, what equipment grounding does, and the common mistakes that leave a system unsafe.

August 29, 2024
Electric Fundamentals

Voltage Classifications Explained: What They Mean and Why They Matter

What nominal voltage, rated voltage and voltage class mean, the standard LV, MV, HV and EHV classifications, and how the NEC, the Canadian Electrical Code and IEC Europe draw the lines differently.

August 14, 2024
Electric Fundamentals Guide

Electrical Harmonics Explained: Causes, Effects and Mitigation

What electrical harmonics are, where they come from, how a current problem becomes a voltage problem, what they do to equipment, why the 3rd harmonic overloads neutrals, and how to mitigate them.

August 7, 2024
Electric Fundamentals

Power Factor Explained: Active, Reactive and Apparent Power in a Beer Jar

Power factor explained with a beer jar: what active, reactive and apparent power are, how power factor is calculated, and why a low power factor means higher losses, higher bills and utility penalties.

August 6, 2024
Next step

Have a data centre project in planning?

Tell us about your project, and we will come back to you.