13 articles

What is actually happening in AI infrastructure Mission Critical Research
Data Centre

Who Owns the Liquid Cooling Loop?

A direct-to-chip cooling loop is built in stages by four or five companies, from design to the day the racks are connected. Who does what, where one company hands over to the next, and where responsibility tends to fall through.

November 10, 2026
Data Centre

When Liquid Cooling Fails: The Seconds That Matter

When a coolant pump or CDU stops, the GPUs in a direct-to-chip liquid-cooled AI data centre have seconds. How the loop works, why it loses cooling in ways an air-cooled room never did, and what ride-through has to prove.

October 27, 2026
Data Centre

Liquid Cooling, Explained: Five Technologies and Where Each Fits

Five liquid cooling technologies for AI data centres: rear doors, single- and two-phase cold plates, single- and two-phase immersion. What each is, where it fits, and what commissioning must prove before the first rack depends on it.

October 8, 2026
Commissioning Field Note

Load Bank Testing in Data Centre Commissioning: Six Problems We See on Almost Every Project

Six load bank testing problems that derail data centre commissioning — generator tests that prove nothing, cooling validation that misses hot spots, and an IST deadline nobody is protecting. If two feel familiar, let's talk.

July 20, 2026
Commissioning Field Note

The Commissioning Illusion: What Your Vendor Start-Up Report Doesn’t Tell You

Vendor start-up proves each piece of equipment in isolation. An independent commissioning authority proves the facility works as one integrated system, and checks what self-witnessed IST scripts miss.

June 25, 2026
Data Centre Field Note

Is Your Data Centre AI-Ready? Probably Closer Than You Think

AI-ready is not a certification. It is a set of thresholds across five systems (power density, structural load, cooling, network and fiber density, and monitoring), and an assessment shows which of them have headroom before any capital is committed.

May 21, 2026
Data Centre Guide

Data Centre Transformer Protection: The Critical Role of the 87T Differential Relay

As AI data centres deploy hundreds of medium-voltage transformers, electrical protection has shifted from a substation specialty to mission-critical infrastructure design. Explore the complete transformer protection stack and the engineering mechanics of the 87T differential relay.

April 9, 2026
Data Centre Guide

The Engineering Guide to Mission-Critical UPS Systems: Static, Hybrid, and DRUPS Explained

How a UPS bridges the gap to backup power, how a double-conversion UPS behaves in online, battery and bypass mode, and how static, flywheel, hybrid and DRUPS architectures compare.

November 20, 2025
Data Centre Field Note

Is Your Data Centre Ready for the Demands of High-Density GPUs?

Racks drawing 50kW, 70kW or more introduce failure points that standard assessments can't account for. Three questions on cooling, power distribution and heat rejection to answer before you scale a high-density GPU deployment.

August 24, 2025
Data Centre

Generator Power Ratings Explained: Standby, Prime and Continuous

How a generator works, kW vs kVA, the difference between standby, prime and continuous duty ratings, derating for temperature and altitude, and how to select a generator.

December 31, 2024
Data Centre

Understanding Power Quality: Issues and Solutions for Critical and Industrial Environments

What power quality is, the key terms, the five most common issues (voltage sags and swells, harmonic distortion, transients, voltage unbalance and poor power factor), how to solve each, and how monitoring catches problems before they cause failures.

September 12, 2024
Data Centre Guide

Understanding Transfer Switches: Types, Applications, and Design Considerations

Manual, automatic, breaker pair and static transfer switches: how each works, open, closed and delayed transition, SCR and IGBT switching, what IT loads need, and how to design and maintain them.